Most conversations about power reliability at a mining site are about outages: the storm that takes a feeder down for six hours, the substation failure, the curtailment event. Those are real and they are measured. But a mining site can lose a meaningful amount of production to a different kind of event that rarely shows up in anyone’s reliability numbers, and that most hosting contracts do not count at all: the momentary interruption.
A momentary interruption is the blink. The lights flicker, the power is gone for a fraction of a second or a couple of seconds, and then it is back. For a household it means resetting the clock on the microwave. For a hall full of ASICs it can mean every machine dropping off its pool at once and spending the next several minutes rebooting, initializing and reconnecting. The grid was gone for a second. The hashrate was gone for much longer.
Where blinks come from
On most distribution systems, the usual cause is a protective device called a recloser. When something briefly contacts a line, such as a tree limb, an animal or storm debris, the recloser opens the circuit, waits a moment, and closes it again to see whether the fault has cleared. As one electric cooperative explains in its guide to power blinks, if the problem was brief the power comes straight back, and if it persists the recloser may try again a few times before locking out until a crew arrives.
That behavior is good engineering. It keeps a passing fault from becoming a long outage for everyone on the circuit. But it means a single disturbance on the feeder can produce several separate blinks in quick succession, and a site that rides through none of them experiences each one as a full stop.
Blinks also come from the site’s own side of the meter: a transfer between sources, a breaker operation during switching, or a voltage sag deep enough that power supplies drop out even though the utility never actually interrupted service. Our article on transformer inrush current at mining sites covers one common source of sags on a site that is already running.
Why a one-second event costs minutes
An ASIC miner is not a light bulb. When power returns after an interruption, it does not resume hashing where it left off. The control board has to boot, the firmware has to load, the fans spin up and are checked, the hashboards are detected and their chips initialized, and the machine has to reconnect to its pool and start receiving work. Only then do accepted shares begin to flow again.
How long that takes varies by model, firmware and configuration, and it is worth timing on your own fleet rather than assuming. What is consistent is that the recovery time is measured on a different scale from the interruption itself. The interruption is counted in seconds or less. The recovery is counted in minutes.
Two things can make the recovery longer than a single machine’s boot time:
- Staggered restart. Bringing every machine back at the same instant can create a large inrush on the site’s electrical system, so many operators deliberately restart in groups. That protects the infrastructure, but it means the last group comes back well after the first. Our guide to UPS and battery backup for mining discusses staggered restart as an alternative to battery ride-through.
- Machines that do not come back on their own. Some units fail to restart cleanly after an abrupt loss of power, and a sudden power event is also a moment when marginal components show themselves. Those machines need someone to notice them and deal with them, which turns a few minutes into hours for that unit.
Multiply the recovery time by the number of blinks per year and the number of machines affected, and a site with a modest number of momentary interruptions can lose more production to them than to the occasional long outage that everyone remembers.
Why the standard reliability numbers miss them
When operators evaluate a site’s power reliability, the usual starting point is the utility’s SAIDI and SAIFI figures: the average total minutes of interruption per customer per year, and the average number of interruptions. Our site selection and power contract guide recommends asking for both for the specific feeder serving a site, and that remains good advice.
But those figures, by design, leave momentary events out. As the U.S. Energy Information Administration explains, SAIDI measures the time an average customer experiences a non-momentary interruption, and for utilities reporting under IEEE standards, non-momentary means lasting longer than five minutes. A blink of one second, or a burst of three reclose attempts in a minute, does not move SAIDI or SAIFI at all.
Momentary events have their own index, MAIFI, the momentary average interruption frequency index. Not every utility tracks it, and fewer publish it feeder by feeder, but it is the right question to ask. A feeder with an excellent SAIDI and a high MAIFI is a feeder that rarely goes out for long and blinks often, which is close to the worst combination for a load that takes minutes to recover from every blink.
Utilities can also report SAIDI with or without major events, such as large storms. When comparing sites, make sure you know which version you are looking at, because the difference between the two can be large.
Why your hosting SLA probably does not count them
The most common way a hosting agreement measures uptime is power availability at the rack or PDU. Under that definition, a site that loses power for one second has one second of downtime. Your machines may have lost several minutes each, but the SLA records almost nothing, and no credit is triggered.
This is not usually bad faith. Power availability is the thing the host directly controls, and it is far easier to measure and agree on than hashrate. But it means momentary events fall into a gap: they are too short to register under the contract and long enough to cost real production. Our explainer on how colocation SLAs measure uptime sets out the alternatives, including hashrate-based definitions, and the trade-offs each one carries.
If momentary events are a material issue at a site, there are reasonable middle grounds to negotiate. One is a minimum downtime charge per event, so that any interruption counts as a fixed number of minutes regardless of how short it was. Another is an agreed recovery window, so the clock runs until power is restored and the affected machines are confirmed hashing again, rather than stopping the moment power returns.
How to find out how often your site blinks
Before you can decide whether momentary interruptions matter at a site, you need to know how often they happen. There are several sources, and the best answer usually combines them.
- Ask the utility. Request MAIFI or a count of momentary events for the feeder, not only SAIDI and SAIFI. If it is not available, ask whether the feeder has reclosers and how many operations they have recorded.
- Ask the host. A well-run site will have power monitoring that records events, and will know how many times the hall has had to recover from a blink in the last year. The answer, and how readily it is given, is informative.
- Read your own fleet data. If you already run machines at a site, a momentary interruption leaves a distinctive signature: every machine’s uptime counter resets at the same moment. Your fleet monitoring may already hold a record of every blink, even if nobody has counted them.
- Install a power quality meter. At larger sites, a meter that logs sags, swells and interruptions with timestamps gives you an independent record that both parties can rely on.
What reduces the cost
You cannot stop a utility’s reclosers from operating, and you would not want to. What you can change is how much each event costs.
- Measure and shorten recovery. Time how long your machines take from power restoration to accepted shares, and look for configuration that shortens it. Small differences matter when multiplied across a fleet and a year.
- Automate the restart sequence. If restart is staggered, make the stagger as short as the electrical design safely allows, and make sure it runs automatically rather than waiting for someone to start it.
- Alert on fleet-wide resets. A simultaneous uptime reset across a hall should raise an alert of its own, followed by a check that every machine came back. The machines that do not restart are where the hours are lost.
- Consider ride-through where it pays. Battery or other ride-through equipment can carry a site through short interruptions. For most mining loads it is hard to justify on outage economics alone, but at a site that blinks frequently the calculation can change. Our guide to power redundancy and backup systems covers the options.
- Weigh it in site selection. Two sites with similar SAIDI can behave very differently. Ask the momentary question before you commit, not after.
The outage that does not look like one
Long outages get attention because they are visible: everyone knows when a site has been down for six hours. Momentary interruptions are easy to miss because each one is small and none of them shows up in the standard metrics or the standard contract. Added up across a year and a fleet, they can be one of the larger sources of lost production at an otherwise reliable site. The fix starts with counting them.
Explore Rax Mining
- Bitcoin Miner Hosting — Tiered rates from $0.085/kWh, NatGas from $0.055/kWh
- NatGas MDU Units — 1MW modular datacenter containers
- Mining Profitability Calculator — Estimate your mining returns
- Our Facility — Tour our mining infrastructure