NatGas Modular Data Center Units

Turnkey 1MW Modules | 60-Day Deployment | Scalable to 30MW

Starting at $600,000 per 1MW Unit

Product Overview

Rax Mining’s Natural Gas Modular Data Center Units (NatGas MDUs) are fully self-contained, rapidly deployable computing facilities housed in standard 40-foot Conex containers. Each 1MW unit arrives ready to operate — just connect natural gas and internet.

Powered by three 350kW natural gas generator sets, these units deliver reliable, cost-effective power for Bitcoin mining, AI/HPC workloads, and edge data center applications. No grid connection required.

Power Pricing

Large Fleets (1MW+)

$0.055/kWh

Fixed rate — 10-year agreement

Ideal for large-scale mining operations and enterprise AI/HPC deployments requiring 1 or more megawatts of capacity.

Smaller Fleets

$0.075/kWh

Fixed rate

Perfect for smaller operations looking for reliable, off-grid power with a single unit or small cluster deployment.

Technical Specifications

Power Capacity1MW per unit
Generators3x 350kW Natural Gas Generator Sets
Enclosure40-foot Conex (shipping container)
CoolingAir cooling & hydro (liquid) cooling supported
ConnectivityStarlink satellite internet included
MonitoringRemote monitoring & management included
Fuel SourceNatural gas (pipeline or well-head)
Grid RequirementNone — fully off-grid capable

Scale Options

NatGas MDUs are designed for modular scalability. Start with a single 1MW unit and expand as your operation grows.

ConfigurationCapacityEstimated Cost
1 Unit1 MW$600,000
5 Units5 MW$3,000,000
10 Units10 MW$6,000,000
30 Units30 MW$18,000,000

Volume pricing may be available for large fleet deployments. Contact us for a custom quote.

Deployment Timeline

From order to operational: approximately 60 days

Our team handles manufacturing, assembly, logistics, and commissioning. Units arrive fully assembled and tested, ready for natural gas hookup and deployment.

Use Cases

Bitcoin Mining

Deploy ASIC miners at remote well sites or stranded gas locations. Convert wasted flare gas into Bitcoin with industry-leading power costs.

AI / HPC

Run GPU clusters for AI training, inference, and high-performance computing workloads at remote or edge locations with reliable off-grid power.

Edge Data Center

Bring compute to the source. Ideal for oil & gas operations, remote industrial sites, or anywhere grid power is unavailable or unreliable.

Agreement Terms

  • Contract Length: 10-year agreement
  • Power Pricing: Fixed rate for the duration of the agreement ($0.055/kWh for 5MW+ or $0.075/kWh for 1–4MW)
  • Includes: Unit hardware, generator sets, cooling infrastructure, Starlink connectivity, remote monitoring, and deployment support
  • Customer Provides: Natural gas supply and site access
  • Maintenance: Rax Mining provides ongoing maintenance and support

Ready to Deploy?

Contact our team to discuss your power requirements and get a custom deployment plan.

Phone: 718-766-8559

Email: info@rax.ae

Schedule a Consultation