NatGas Modular Data Center Units
Turnkey 1MW Modules | 60-Day Deployment | Scalable to 30MW
Starting at $600,000 per 1MW Unit
Product Overview
Rax Mining’s Natural Gas Modular Data Center Units (NatGas MDUs) are fully self-contained, rapidly deployable computing facilities housed in standard 40-foot Conex containers. Each 1MW unit arrives ready to operate — just connect natural gas and internet.
Powered by three 350kW natural gas generator sets, these units deliver reliable, cost-effective power for Bitcoin mining, AI/HPC workloads, and edge data center applications. No grid connection required.
Power Pricing
Large Fleets (1MW+)
$0.055/kWh
Fixed rate — 10-year agreement
Ideal for large-scale mining operations and enterprise AI/HPC deployments requiring 1 or more megawatts of capacity.
Smaller Fleets
$0.075/kWh
Fixed rate
Perfect for smaller operations looking for reliable, off-grid power with a single unit or small cluster deployment.
Technical Specifications
| Power Capacity | 1MW per unit |
| Generators | 3x 350kW Natural Gas Generator Sets |
| Enclosure | 40-foot Conex (shipping container) |
| Cooling | Air cooling & hydro (liquid) cooling supported |
| Connectivity | Starlink satellite internet included |
| Monitoring | Remote monitoring & management included |
| Fuel Source | Natural gas (pipeline or well-head) |
| Grid Requirement | None — fully off-grid capable |
Scale Options
NatGas MDUs are designed for modular scalability. Start with a single 1MW unit and expand as your operation grows.
| Configuration | Capacity | Estimated Cost |
| 1 Unit | 1 MW | $600,000 |
| 5 Units | 5 MW | $3,000,000 |
| 10 Units | 10 MW | $6,000,000 |
| 30 Units | 30 MW | $18,000,000 |
Volume pricing may be available for large fleet deployments. Contact us for a custom quote.
Deployment Timeline
From order to operational: approximately 60 days
Our team handles manufacturing, assembly, logistics, and commissioning. Units arrive fully assembled and tested, ready for natural gas hookup and deployment.
Use Cases
Bitcoin Mining
Deploy ASIC miners at remote well sites or stranded gas locations. Convert wasted flare gas into Bitcoin with industry-leading power costs.
AI / HPC
Run GPU clusters for AI training, inference, and high-performance computing workloads at remote or edge locations with reliable off-grid power.
Edge Data Center
Bring compute to the source. Ideal for oil & gas operations, remote industrial sites, or anywhere grid power is unavailable or unreliable.
Agreement Terms
- Contract Length: 10-year agreement
- Power Pricing: Fixed rate for the duration of the agreement ($0.055/kWh for 5MW+ or $0.075/kWh for 1–4MW)
- Includes: Unit hardware, generator sets, cooling infrastructure, Starlink connectivity, remote monitoring, and deployment support
- Customer Provides: Natural gas supply and site access
- Maintenance: Rax Mining provides ongoing maintenance and support
Ready to Deploy?
Contact our team to discuss your power requirements and get a custom deployment plan.
Phone: 718-766-8559
Email: info@rax.ae
