Data Center & Colocation Hosting in Utah

Flexible pricing models with up to 14MW capacity and off-peak optimization

Infrastructure Overview

Utah offers sophisticated power management options with up to 14MW of capacity at the Clearfield facility. Operators can choose between 100% uptime at approximately 9.5-10 cents per kWh or optimize costs with 80% off-peak operation at 5.5-6.2 cents. This flexibility makes Utah ideal for miners with advanced power management strategies.

Grid Advantages:

Western Interconnection grid with diverse energy mix including solar, wind, and natural gas. Dry climate is ideal for air-cooled mining operations. Business-friendly state with strong data center industry presence.

Mining Farm Opportunities

Lease or purchase turnkey mining facilities in Utah.

Clearfield, UT (14MW)

Power Rate
5.5-10¢/kWh
Capacity
14 MW (7.5+6.5)
Cost
$15k/MW/month, 1MW MOQ

100% uptime @ ~9.5-10¢ OR 80% off-peak @ ~5.5-6.2¢. Flexible power management options

Why Utah?

Flexible Pricing

Choose your power model: 100% uptime for maximum hash rate, or 80% off-peak operation for the lowest possible per-kWh cost.

🔒

14MW Scale

Major capacity available across two dedicated power feeds (7.5MW + 6.5MW) for large-scale operations.

🛠

Dry Climate

The arid climate in Utah is ideal for air-cooled mining operations, reducing infrastructure complexity and costs.

Ready to Deploy in Utah?

Book a free 20-minute consultation to discuss capacity, pricing, and deployment timelines.